27/10/2015

DEMOLITION PROJECT DESIGNER for Swift Worldwide Resources

DEMOLITION PROJECT DESIGNER

Employer:
Swift Worldwide Resources
Posted:Oct 26 2015
Desired Expertise:Drafting
Experience:1+ years
Minimum Education:Bachelors/3-5 yr Degree
Salary:Based On Experience
Location:Borger, TX, US
Employment Type:Full Time Contractor
Job Status:Active / Open
Work Authorization:None
Please login to bookmarkJob Description:
DEMOLITION PROJECT DESIGNER
MUST HAVE AN ENGINEERING DEGREE AND MUST HAVE DEMOLITION DESIGN EXPERIENCE
. Autocad is a must and Cadworx would be a plus.
  • Walkthrough demolition project during preliminary review with operations and demo project personnel.
  • Research and pull drawings for P&ID's, Plot Plans, equipment, piping plans and details, piping isometrics, electrical layout, instrument loops, instrument panels, schematics, and civil/structural drawings.
  • Walkdown and mark up drawings to show equipment to be removed, piping cut/disconnect points, instruments to be removed, instrument and power conduit disconnect points, and foundations to be removed. Mark drawing discrepancies for as-built updates as necessary. Take photos as necessary to be used in preparing the demolition package.
  • Prepare demolition project drawings/documents, manual and cad drafting, and photo markups. Use electronic media for final package preparation. Scan in manual drawings and mark up using Adobe Pro or equivalent software.
  • Create demo equipment list, line list, relief valve list, instrument list and drawing list and place in Project Description document.
  • Keep all demolition project drawings, documents, and supporting information stored in the appropriate folder under the project directory. Maintain standardized folder structure.
  • Prepare demo package as Adobe files, one each for MF drawings, I/E drawings & documents, Piping/Mechanical drawings and documents, and Civil/Structural drawings and documents. Place Adobe files in the project's IFA folder.
  • Attend project MOC Impact review meeting and provide input on demolition design and drawing issues.
  • Make changes as required after IFA and MOC comments are returned and place final pdf files in IFC folder.
- See more at: http://www.rigzone.com/jobs/postings/871632/DEMOLITION_PROJECT_DESIGNER.asp#sthash.nkjISX5j.dpuf

No comments:

Post a Comment